April 2014

Berkeley Engineering Consultants have been awarded the following studies: Traffic Study for Relocation of Transportation Gate & Construction of Additional Truck Lanes at Al-Khafji for Saudi Aramco SIL Study for NTP and Subcontract Order for SIL Study – Increase Riyadh-Qassim Product Pipeline Capacity, RQ-2 for Saudi Aramco Hazop for Closed Drain and Washwater System Upgrade …

April 2014 Read More »