NEWS

Berkeley Engineering Consultants

April 2017

Berkeley Engineering Consultants have been awarded the following Projects: BI-10-00631 – SIL DEBOTTLENECKING ONSHORE PLANTS SAFANIYAH – Saudi Aramco EIA CAT III – Royal Commission Yanbu N2-Package – Saudi Aramco BI-10-02016 ARBI 24/27 – QRA – Saudi Aramco

Read More »

March 2017

Berkeley Engineering Consultants have been awarded the following Projects: Environmental Impact Assessment Study – Saudi Aramco BI-10-01565 Jubail Rastanura Project Pipeline – Hazop – Saudi Aramco BI-10-00631 – HAZOP DEBOTTLENECKING ONSHORE PLANTS SAFANIYAH– Saudi Aramco

Read More »

February 2017

Berkeley Engineering Consultants have been awarded the following Projects: Sour water condensate Line to be executed in our Tanajib Project – Saudi Aramco BI-10-01565 Jubail Rastanura Project Pipeline – Hazop – Saudi Aramco BI-10-00631 – HAZOP DEBOTTLENECKING ONSHORE PLANTS SAFANIYAH – Saudi Aramco

Read More »

January 2017

Berkeley Engineering Consultants have been awarded the following Projects: Petrokemya – Study for Covering Evaporation Pond Butane/Propane metering skid at YASREF RFQ for Request for Seal/Stamping of Fire Alarm drawing as per Saudi ARAMCO requirements, Project: TCP, KHAFJI TO TANAJIB SOUR GAS HANDLING & MSAE013-RFQ076-LOSS PREVENTION CONSULTANT_BCD: 10-OCT-2016_BERKELEY

Read More »

December 2016

Berkeley Engineering Consultants have been awarded the following Projects: MSAE014-RFQ-0003-NORTHERN ARABIA AREA UNCONVENTIONAL GAS (UG) SURFACE FACILITIES SYSTEM-B -SIL – Saudi Aramco BI-10-01221, Northern Area Pipeline Reroute – SIL – Saudi Aramco 34280 – EMP – Khurais SW PL – Environmental Plans and Procedures – Consultancy Works – Saudi Aramco

Read More »

November 2016

Berkeley Engineering Consultants have been awarded the following Projects: CLOSED RELIEF SYSTEM AND FLARE GAS RECOVERY SYSTEM AT QATIF-ABU SAFAH CENTRAL PRODUCING FACILITY (QCPF) – Hazop – Saudi Aramco Special In-House Training Proposal Request for SABIC Engineers in Hazop – Saudi Aramco CLOSED RELIEF SYSTEM AND FLARE GAS RECOVERY SYSTEM AT QATIF-ABU SAFAH CENTRAL PRODUCING

Read More »

October 2016

Berkeley Engineering Consultants have been awarded the following Projects: BI-10-01628-Sour water stripper and disposed system-BGP – Saudi Aramco B2-10-00242-Replace Electrical Equipment at southern area GPSPS – Saudi Aramco COMPLETE DESIGN & BRA FOR MAINTENANCE WORKSHOP AT AL SULAYYIL – SAUDI ARAMCO – Saudi Aramco Consultancy services for Emergency voice evacuation system integrated with fire alarm

Read More »

September 2016

Berkeley Engineering Consultants have been awarded the following Projects: CLOSED RELIEF SYSTEM AND FLARE GAS RECOVERY SYSTEM AT QATIF-ABU SAFAH CENTRAL PRODUCING FACILITY (QCPF) – Hazop – Saudi Aramco J40537-Sour Water Pipeline from JNGL Fractionation Plant to RTR (HAZOP) – Saudi Aramco

Read More »

August 2016

Berkeley Engineering Consultants have been awarded the following Projects: Request for budgetary Quotation – Project JO #10-10-00966 UPGRADE SECURITY FACILITIES – EIA – Saudi Aramco HAZOP Facilitation – Saudi Aramco SEP Detailed Design – YANPET

Read More »

July 2016

Berkeley Engineering Consultants have been awarded the following Projects: MSAE014: RFQ-0007- NORTHERN ARABIA AREA UNCONVENTIONAL GAS (UG) SURFACE FACILITIES SYSTEM-B QRA & BRA STUDY – Saudi Aramco G184-W004: Upgrade Pier Facilities – Tanajib – SIL  – Saudi Aramco

Read More »
Scroll to Top